e information and knowing sequences of work of
steel pipe sheet pile driving. as shown on the sketches, we also know
that is needed pile guide as temporary works, etc. Please see in figures
below the work method sketches.
Note: (Step A is bottom part, Step B is the top part by on site
splicing), bear in mind that is needed one pile as a master pile; means
bottom part and top part should be finished before next pile to be
continued, as shown on figure Step-A1 and Step-A2.
You also should know that there are three common types joints
of steel pipe piles (L-T type, P-P type and P-T type) as shown on figure
below: